When Will One Marina Gardens Be Completed?

The One Marina Gardens Completion Dates in Brief

The developer of One Marina Gardens, Kingsford Marina Development Pte Ltd, gives 30 April 2029 as the expected date of vacant possession and 30 April 2032 as the expected date of legal completion, in its factsheet of 12 March 2025. The homes are being sold while the two towers are under construction.

Both are targets set by the developer. For a given home, what counts is the set of dates written into its own sale and purchase agreement, and the Sales Concierge can take a buyer through them.

One Marina Gardens Milestones So Far

The site has moved from land tender to sales in a little over two years. The record below is drawn from the latest updates page.

DateMilestone
5 December 2022The Urban Redevelopment Authority launches the Marina Gardens Lane site, the first homes of the Marina South precinct, for tender
27 June 2023The tender closes; a Kingsford-led consortium submits the top bid
9 October 2023The 99-year lease of the site begins
14 December 2024First building plan approval shown on the developer’s floor plans
24 February 2025Second building plan approval shown on the floor plans
March 2025Preview; the factsheet of 12 March 2025 sets out the 937 homes
April 2025Launch; the development is open for sale
30 April 2029Expected vacant possession
30 April 2032Expected legal completion

Sources: the developer’s factsheet and floor plans; URA media release, 5 December 2022; EdgeProp, June 2023.

What Is Being Built at One Marina Gardens

The works cover a 44-storey tower and a 30-storey tower on a site of about 12,245.1 square metres, with a plot ratio of 5.6. The two towers rise from a podium: its first storey carries the arrival, the three shops, the restaurant and the childcare centre, and its second storey is the landscape deck with the 50-metre pool, the grand lawn and the clubhouse. Below ground is a basement car park of 445 lots.

The developer’s factsheet also includes addition and alteration works to Entrance 4 of Marina South MRT station on Marina Gardens Lane. Altogether the plans provide 937 homes, in Block 3 from the 2nd to the 30th storey and in Block 5 from the 2nd to the 44th.

Who Is Building One Marina Gardens

The developer of record is Kingsford Marina Development Pte Ltd, holder of housing developer’s licence C1509, and the QJEC-LBC Joint Venture is the main contractor. P&T Consultants is the architect, Index Design the interior designer and Ecoplan Asia the landscape consultant, with KCL Consultants as civil and structural engineer and United Project Consultant as mechanical and electrical engineer.

The developer belongs to the Kingsford group, which by its own profile was established in 2011 and has completed developments including Normanton Park, Kingsford Waterbay and Kingsford Hillview Peak. The developer page sets out the company and its team.

How Construction Stages Shape a One Marina Gardens Purchase

Since buyers commit before the towers are finished, they pay under the normal progressive payment scheme, and an instalment becomes due as each stage of the works is certified, in this order: foundation; reinforced concrete framework; partition walls; roofing and ceiling; doors, windows, wiring and plumbing; and car park, roads and drains.

Construction ends with two closing payments: 25% of the price on the Temporary Occupation Permit, then the final 15% on the Certificate of Statutory Completion. Anyone booking once some stages are certified settles the instalments already due according to the timetable in the sale and purchase agreement. Every stage is listed on the payment scheme page.

The Station and the Precinct around One Marina Gardens

Completion of the homes matters beyond the towers. The Minister for Transport said in January 2022 that Marina South MRT station, about 125 metres from the site on OneMap, would open in tandem with the completion of the homes in the area, and the developer’s factsheet expects the connection from the development to operate once the homes are completed.

One Marina Gardens is the first residential development of the Marina South precinct, so its residents will live alongside further construction for some years, with shops and services arriving as the district fills. The development’s own three shops, restaurant and childcare centre, Gardens by the Bay next door and Marina Bay about a kilometre away carry those early years.

Tracking Progress at One Marina Gardens

The latest updates page records each milestone as it is reached, and the project details page lists every confirmed particular. For a home still available, the Sales Concierge sends the price list with the stages already certified at the time of booking. The latest updates page will also carry updated counts on the balance units chart as sales continue, and any statutory change to stamp duty or loan limits will be reflected on the financing pages. Showflat viewings are arranged by appointment through the Sales Concierge.

This article is general information as at the date shown and is not financial, legal or tax advice. Particulars of One Marina Gardens come from the developer’s factsheet, plans and project page; rules are given as stated on this site’s financing pages, and distances are straight lines measured on OneMap. Sources: the developer’s factsheet (12 March 2025) and floor plans, the URA media release of 5 December 2022 and EdgeProp (June 2023), as set out on this site’s latest updates and project details pages.